-
GuillermoExcellent! Fast delivery! I like to work with you again! -
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us. -
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration. -
SjakThat's true we enjoy doing business with you. -
Kelly MarshLiFong is one of our desired vendors in China -
রাইমুন্ড শেঙ্কপণ্যের গুণমান, প্রতিযোগীতামূলক মূল্য, সর্বদা আমাদের মূল সরবরাহকারীদের মধ্যে একটি
Air-Blower Aluminium Die Casting Parts Chimney Fans Eight Cases
| Place of Origin | Guangdong, Mainland China |
|---|---|
| পরিচিতিমুলক নাম | LF |
| সাক্ষ্যদান | ISO9001:2008 |
| Model Number | LF-LX0101 |
| Minimum Order Quantity | 5000 PCS |
| মূল্য | negotiable |
| Packaging Details | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
| Delivery Time | MOQ 2 Weeks, 30,000pcs+ : 4 Weeks. |
| Payment Terms | TT, L/C, D/P, T/T |
| Supply Ability | 50,000 PCS Per Month |
বিনামূল্যে নমুনা এবং কুপন জন্য আমার সাথে যোগাযোগ করুন.
হোয়াটসঅ্যাপ:0086 18588475571
Wechat: 0086 18588475571
স্কাইপ: sales10@aixton.com
যদি আপনার কোন উদ্বেগ থাকে, আমরা 24-ঘন্টা অনলাইন সহায়তা প্রদান করি।
x| বিশেষভাবে তুলে ধরা | die cast parts,high pressure die casting process |
||
|---|---|---|---|
Air-Blower Aluminium Die Casting Parts Chimney Fans Eight Cases
Quick Details:
Precision Aluminum Die Casting & Aluminum Casting
Application: Blower Machine & Air-Blower
Depend on Customer’s requirements
Description:
Aluminum Die Casting Chimney Fans For Air-Blower
Eight Case Chimney Fans
Application:
Air-Blower & Blower Machine
Specification:
| Overall Dimension | L280mm*W137mm*H100mm |
| Application |
Air-Blower & Blower Machine |
| Part Weight | 1.94kg |
| Material | Aluminum Alloy, ADC12 |
Processing Technic:
1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP
2. Die Casting-- Remove Water Gap--Deburring-- Machining--Drilling Holes/ Threading-- Quality Check (dimension and surface) -- Packing
Advantage:
1. Professional Research and Design Team (20 Persons), Possess All Necessary Equipments.
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication

